Sign In | Join Free | My benadorassociates.com
China TORICH INTERNATIONAL LIMITED logo
TORICH INTERNATIONAL LIMITED
TORICH INTERNATIONAL LIMITED The Steel Tube Maker
Verified Supplier

11 Years

Home > Automotive Steel Tubes >

Torich E355 Shock Absorber E235 Gas Spring Steel Pipe EN10305-4

TORICH INTERNATIONAL LIMITED
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Torich E355 Shock Absorber E235 Gas Spring Steel Pipe EN10305-4

Brand Name : TORICH

Model Number : en10305-4

Certification : ISO9001 ISO14001 TS16949

Place of Origin : China

MOQ : 1tons

Price : $1050-1200

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 20 tons per month

Delivery Time : 45-60 work days

Packaging Details : Packed in hexagonal in boxes

OD : 5-420mm

WT : 0.5-50mm

Length : As requirement

Standard : ASTM A 519, EN 10305,etc

Usage : Automobile, shock absorber

Tolerance : ±3%

Contact Now

Torich E355 Shock Absorber E235 Gas Spring Steel Pipe EN10305-4

Referenced Standard:

EN10027-1, Designation system for steels-part1: Steel names

EN10027-2, Designation system for steels-part2: Numerical system

EN10204:2004,Metallic products-Types of inspection documents

EN10266:2003 Steel tubes, fittings and structural hollow sections- symbols and definitions of terms for use in products standard

Chemical composition:

Steel grade % by mass
Steel name Steel number C max Si max Mn max P max S max Al min
E215 1.0212 0.10 0.05 0.7 0.025 0.015 0.025
E235 1.0308 0.17 0.35 1.2 0.025 0.015 0.015
E355 1.0580 0.22 0.55 1.6 0.025 0.015 0.02

Mechanical Properties:

Steel grade Mechanical properties
Steel name Steel number Yield strength ReH min MPa Tensile strength RM MPa Elongnation after fracture A min %
E215 1.0212 215 290-430 30
E235 1.0308 235 340-480 25
E355 1.0580 355 490-630 22

Product Name Automobile gas spring shock absorber steel pipes
Standard EN10305, DIN 2393, ASTM A519, etc
Material 1020, 16Mn, etc
Usage Automobile, hydraulic ,shock absorber,etc
Technique Cold drawn
OD 5-420mm
WT 0.5-50mm
Length Max 12000mm
Tolarance ±3%
Certification ISO9001 ISO14001 TS16949
Section Shape Round
Payment T/T ,L/C,Money Gram, Western Union
Delivery FOB,CIF,CFR,CPT,etc
Package Packed in hexagonal in boxes


Product Show:

Torich E355 Shock Absorber E235 Gas Spring Steel Pipe EN10305-4Torich E355 Shock Absorber E235 Gas Spring Steel Pipe EN10305-4Torich E355 Shock Absorber E235 Gas Spring Steel Pipe EN10305-4




QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

A&Q

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample of SCM 440 42CrMo Mechanical Tubing for Reinforcement sleeve for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

RFQ:

What is your Guarantee?
1.SO9001:2008 and TS16949 certification, SGS, BV, TUV or other third party inspection is available.
2.High quality with competitive price.
3.Advanced technology, experienced engineer, ISO quality system for quality assurance and traceability.

Do you have agent or distributor in our country?
1.We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.


How is your production capability?
1.2000 tons monthly production capacity, 5000 tons monthly trading capability
2.Prompt and Timely shipment

How to get the sample?
1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.

What is your Payment Term?
1.T/T: 30% deposit in advance, the balance 70% paid before shipment
2.30% down payment, the balance 70% paid against L/C at sight
3.Upon negotiation

Who are your customers?
1.Stockists, Distributors,Wholesalors,Agents, Traders, End Users, etc


How long will you react on our requirement?
1.Your requirement would be treated within 24 hours on weekdays. Quotations would be sent upon technical details confirmed by customer!

Any more questions about your doubts, please feel free to send us your emails or call
















Product Tags:

Torich spring steel pipe

      

E235 spring steel pipe

      

EN10305-4 spring steel pipe

      
Quality Torich E355 Shock Absorber E235 Gas Spring Steel Pipe EN10305-4 for sale

Torich E355 Shock Absorber E235 Gas Spring Steel Pipe EN10305-4 Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: TORICH INTERNATIONAL LIMITED
*Subject:
*Message:
Characters Remaining: (0/3000)